This survey is intended to help guide the Cooperative to plan its future electric infrastructure growth. Allowing the Cooperative to continue to fulfill its mission to deliver safe, reliable, affordable electricity to the Eastern Shore of Virginia. Your responses will be used for long-range system planning only. Member and Facility InformationCompany Name(Required)Primary Contact Name(Required) First Last TitleEmail(Required) Phone(Required)Secondary Contact Name First Last TitleEmail PhoneService Address(es)(Required) Single Location Multiple Locations Address (use + to add extra fields if multiple)(Required)Street AddressTown Add RemovePrimary Industry Classification(Required) Agriculture Data Center State Healthcare Manufacturing Retail Warehouse/Distribution Other Current Electric ServiceCurrent Peak Demand (kW)(Required) < 500 KW 500-1,000 KW 1-3 MW 3-5 MW 5-10 MW > 10 MW Current Annual Energy Usage (kWh) (optional) < 1 GWh 1-5 GWh 5-25 GWh > 25 GWh Expected Load Growth (next 10 years)Do you anticipate load growth at this facility? Yes No Unsure We Anticipate Load Reduction Describe Anticipated Load Change (if applicable)If YES, When Do You Expect Increased Load To Occur? 0-12 months 1-3 years 3-5 years 5-10 years Estimated Additional Peak Demand < 250 KW 250-1,000 KW 1-5 MW 5-10 MW > 10 MW Unknown at this time Estimated Additional Annual Energy Usage (kWh) (if known):Will the growth be: A one-time step increase Phased in over time Seasonal Intermittent/variable Unknown at this time Drivers of Load GrowthWhat factors are driving anticipated load growth? (check all that apply) Facility Expansion New production lines/equipment added Electrification of existing processes (fossil fuel to electric) Addition or expansion of electric fleet vehicles (including forklifts) On-site data processing/servers HVAC electrification/Heat pumps Regulatory or environmental compliance Other (see below) If Other:Distributed Energy Resources (DERs)Do You Currently Have On-site Generation or Storage? Standby/Backup Generation Solar (photovoltaic) CHP/Cogeneration Battery Energy Storage None Standby/Backup Generation kW (if applicable)Solar (photovoltaic) kW (if applicable)CHP/Cogeneration kW (if applicable)Battery Energy Storage (if applicable)kWkWhAre you planning to add DERs in the future? Yes No Unsure If YES Please DescribeAre You Currently a Participant in a Demand Response (DR) Program? Yes No Unsure Are You Interested in Participating in a DR Program? Yes No Unsure Communication and PlanningWould You Like to Schedule a Time to Discuss Future Load Growth and/or Service Needs with the Cooperative? Yes No Do You Have Questions About the Billing Components on Your Monthly Bill or About the Rate Tariff Your Business is Currently Served Under? Yes No Please Add Any Additional Comments or Clarifications You Feel the Survey Did Not Include: