For an A&N Electric Cooperative engineer to make a site visit for the purposes of establishing a new service to a house, pedestal, lot or property there are several steps for the cooperative member to complete.
Below is a PDF checklist for new construction applications.
For item number 4, it is the member’s responsibility to have the meter socket inspected. To setup an inspection for Northampton County and the Town of Chincoteague call (757) 709-1025. For the Town of Cape Charles call (757) 331-3259 Ext. 22. For Accomack County (non-Chincoteague residents) please call (757) 787-5721 or use Accomack County’s online Permit Portal.